top of page

KEY PORT INFORMATION

 

Terminal Manager

Blair Taylor

T. 207.548.2531

C. 207.322.2859

​btaylor@spragueenergy.com

 

Dry Cargo Pier

  • 100’ x 560’ working surface

  • Deck Load Capacity 1,000 psf

  • Berth #1 800+ feet long, -40’ MLW

  • Berth #2 800+ feet long, -32’ MLW

 

Liquid Cargo Pier

  • Multi Purpose Hose Platform

  • Berth #1 700+ feet long, -37’ MLW

  • Berth #2 500+ feet long, -25’ MLW

 

Storage Areas

  • 1.6 million barrel active tank

  • truck and rail loading racks

  • 5 Paved Storage pads

  • truck and rail access

  • 90,000 sq. ft. warehouse

  • truck and rail access

  • 70+ acres for development

 

Intermodal Truck to Rail Facility

  • Over 6,500 feet of on-site rail siding interconnected with Canadian Pacific, Canadian National, Pan Am, NBS Railways and Central Maine and Quebec Railway

 

Tidal Range 10 feet

  • Approach Channel and Turning Basin -35’ MLW

bottom of page